San Luis Obispo County Airport New Terminal

2016-12-12T12:38:37-08:00

Project Description: This $35.4 million new terminal project includes a two-building, 48,500-square-foot facility with a ticketing lobby, a baggage claim area, passenger and baggage screening, restrooms, administration offices, support areas, waiting lounges and boarding areas as well as site improvements and airport apron construction. The new terminal will replace an aging facility and is designed [...]

San Francisco International Airport Replacement Airport Traffic Control Tower and Integrated Facilities

2020-07-08T13:55:25-07:00

Project Description: The San Francisco International Airport (SFO) Replacement Air Traffic Control Tower (ATCT) and Integrated Facilities project is a $142M, design-build post-tension project comprising a new ATCT and a non-secure corridor between SFO Terminals 1 and 2. The tower stands at 221 feet tall with a three-story building underneath. This project used structured Collaborative [...]

SFO Z1 Blast Fence and Taxi Lanes

2016-06-22T15:43:39-07:00

Project Description: This was a small ($3.6M), but complex project involving the installation of an airfield blast fence and the resurfacing and re-routing of Airport Taxi lanes in the north end of the San Francisco International Airport Airfield.  This project team piloted the OrgMetrics Small Project PartneringTM Process, where team members participated in the kick-off [...]

Oakland RSA – North Field, Oakland International Airport

2016-06-22T15:47:41-07:00

Project Description: $43 million Federal Aviation Administration (FAA) mandated Runway Safety Area Project, involving the addition of lighting, safety features and EMAS at each end of the North Field Runway at Oakland International Airport.  This was a Partnering Pilot for the Port of Oakland and was the first time they used the full structured Collaborative [...]

SFO RSA R/W 10R Paving and Lighting Project

2017-06-18T01:55:41-07:00

Project Description: The RSA R/W 10R Paving and Lighting Project, part of SFO’s Runway Safety Area (RSA) improvement program was the first of several RSA projects at SFO that brought the airport up to compliance with FAA design standards. Project Challenges: The project lengthened the 10R runway 800 feet, required paving, excavation, grinding, soil stabilization, [...]

SFO West Field Cargo

2016-06-22T15:52:49-07:00

Project Description: The West Field Cargo Redevelopment Facility (WFC) at San Francisco International Airport (SFO). The cargo area, approximately 62,000 sf with a clear height of 26 feet included two office pods, each two stories tall, total about 14,000 sf. The project was completed with a perfect safety record. Project Challenges: A traditional cargo facility [...]

SFO Terminal 3 Boarding Area E

2016-06-21T11:31:16-07:00

Project Description: The $71 million SFO Boarding Area E Improvements project was set to completely rebuild the existing boarding area, adding over 32,000 SF of additional space, expanding the nine aircraft boarding gates, enhancing dining and shopping options, and to achieve LEED Gold standard in sustainability. Project Challenges: With a 24 month project deadline, a [...]

SFO Terminal 2

2016-06-14T15:59:23-07:00

Project Description: The Terminal 2 project at SFO was a $383 million overhaul project that updated the outdated 1954 vintage building. Terminal 2 featured a state-of-the-art lounge, art exhibits, kids play areas and hydration stations. It also represented a new experience for travelers and cemented SFO’s reputation as the major gateway Project Challenges: The Terminal [...]

SFO Runways 1-19s RSA Improvements Project

2016-06-14T16:01:38-07:00

Project Description: The improvements made to SFO Runways 1-19s Runway Safety Area brought SFO’s four runways up to full compliance of FAA Standards. The contract included over $95M of direct construction work as well as the installation by the Contractor of over $50M of owner supplied materials. The Team completed the work one month ahead [...]